DAY 5: Yesterday all the plumbing was adjusted and installed. The new tub looks great. A drain that will work. Right now the subfloor and dry wall is going up.
DAY 5: Yesterday all the plumbing was adjusted and installed. The new tub looks great. A drain that will work. Right now the subfloor and dry wall is going up.